Maple Corner Community Center: Building Committee   Oct. 30th, 2000

List of Necessary Work for Building Upkeep

 

Work

Desription

Category

Cost Est.

Fire Escape

Build new fire escape on back or south gable end

Fire code

$10 – 12,000

Misc. small fire code jobs

Door swings, blocking off trap doors, alarms, sprinkler head over furnace, tie-in exit signs to alarm system

Fire code

$700

First floor/weatherization

Patch floor where registers are

Energy

$200

Leaky roof over stage

Repair roof, fix ceiling

Maintenance

$2000

Furnace vent

Bypass leaking chimney to vent furnace vapors

Maintenance

 

$600

Cellar Floor

Clean and put plastic, sand or concrete on floor

Maintenance

$600+

Insulate cellar walls

 

Energy

 

Wiring upgrades

Fix the exposed wires in cellar

Maintenance

$600

New water heater, misc. plumbing

 

Maintenance

$500

Handicap bathroom

Enlarge and replumb, new fixtures

Handicapped Accessibility

6,000-8000

Front door threshold

Lower height

Handicapped Accessibility

 

Kitchen Plumbing

Re-do to allow easy draining

Maintenance

$400

Kitchen floor

Repair floor under sink

Maintenance

 

Kitchen - Rotted sill

Replace under exterior door

Maintenance

$1000

Kitchen – new exterior door

Move to new location when bathroom is extended, gutter over door

Maintenance

$800

Kitchen renovation

Wall, countertops, cupboards, new sink, new window over sink, lights

Renovation

$3000

Storm windows 1st floor

10

Energy

$1000

Paint floors - 1st

 

Maintenance

$700

Paint walls – 1st

 

Maintenance

$500

Insulate walls – 1st floor

Blow in cellulose

Energy

 

Dining room

Raise pass-through opening

Renovation

$1000

Dining room

Take out part of wall to foyer

Renovation

$500

Dining room - new door to backyard

Easy access to back yard for future picnic area & playground

Renovation

$800

Foyer – add ceiling light

 

Maintenance

$150

Storm windows – 2nd floor

 

Energy

$1200

Windows – 2nd

Add lower chair rail

Safety

$100

Insulate walls – 2nd floor

Blow in celluose, attic too

Energy

$1200

Re-finish hardwood floor

Remove stains and re-finish

Maintenance

$1000

Paint walls – 2nd floor

 

 

Maintenance

$1000

Repair stair treads

 

Maintenance

$300

Repair and re-paint chairs

 

Maintenance

$500